Sudan Power Crisis to Opportunity: 4.02GW Capacity and Investment Guide

Article: Investment in Sudan's Electricity Sector, Opportunities, Challenges, and Market Size

First: Introduction

Sudan is facing a structural electricity crisis, the installed capacity is 4.02 GW but only ~2 GW is actually utilized out of 3.5 GW peak demand,

with infrastructure destruction and increasing reliance on regional solutions, investment in electricity has become a national necessity, in this article we review market size, key power plants, interconnection projects, opportunities, and how we can be a partner in the solution.

Second: Market Data + Key Power Plants

Current status according to 2023 data:

- Installed Capacity: 4.02 GW

Hydropower: 1.48 GW، Fossil Fuels: 1.34 GW، Natural Gas: 0.48 GW، Biomass: 0.2 GW، Solar: 0.19 GW only

- Actual Production: ~3000 MW max، Utilized: ~2000 MW

- Peak Demand: 3500 MW، Coverage Rate: 73.5%

- Losses: Destruction of +10,000 transmission towers، Outages up to 14 hours daily

Top 5 Power Plants in Sudan:

1. Merowe Dam: 1250 MW، 10 turbines، 6500 GWh annually، the backbone of the national grid

2. Roseires Dam: 1800 MW after expansion، on the Blue Nile

3. Um Dabakir Thermal Plant: 500 MW، serves White Nile State and western regions

4. Al Jaili Power Plant: 460 MW، serves Bahri and North Khartoum، a key substation hub

5. Garri Thermal Plant: Currently out of service due to the war

Third: Regional Interconnection Projects

As part of efforts to overcome the crisis, Sudan is enhancing electricity interconnection with neighboring countries:

1. Interconnection with Egypt - Toshki 2 / Wadi Halfa Line

Target Capacity: 300 MW،

Length: 170 kilometers،

Phase One: 70 MW already operational،

Impact: Improves grid stability in northern Sudan، and forms the basis for a future Egypt-Sudan-Ethiopia tripartite interconnection

2. Understanding with Ethiopia

Electricity exchange in return for LPG supplies،

Includes continued cooking gas exports and facilitating fuel imports،

Opens the door to a flexible and sustainable regional energy market

Regional interconnection is an important interim solution, but it is not sufficient without a national plan, and diversifying local sources.

Fourth: Main Investment Opportunities

1. Solar Energy IPP: Solar share is only 0.19GW despite irradiation of 6-7 kWh/m2, opportunity for 50-200MW plants

2. Wind Energy: Red Sea coast wind speed 7-8 m/s has not been commercially exploited yet

3. Grid Modernization: Rehabilitating destroyed towers, SCADA, smart meters to reduce losses by 25%

4. Hybrid Solutions for Industrial Sector: Diesel alternative for factories, mines, and agriculture

Fifth: Incentives and Compliance

We are committed to all legal procedures and required licenses, we operate according to the approved system and the requirements of the Central Bank of Sudan, Ministry of Energy, and Customs to ensure project implementation.

Incentives:

- Investment Encouragement Act: 10 years tax and customs exemptions

- BOOT and IPP system with long-term PPA contracts

- Facilities for importing energy equipment

Sixth: Conclusion + CTA

The future depends on 3 things: political stability, infrastructure rehabilitation, and diversifying sources to solar and wind, the biggest challenge remains financing and governance.

We are your partners to implement your plan:

Feasibility Studies, Importing Energy Equipment, EPC Execution, O&M Contracts

Ready to start? Contact us today.